Western Canal Interceptor Rehabilitation
Dibble CM provided construction management and inspection services for the Western Canal Interceptor Rehabilitation project. The project included CIPP lining 1,720 linear feet of 42-inch and 54-inch diameter pipe, as well as removing and replacing a concrete junction structure with a polymer concrete base and manhole structure.
Our services included managing the construction schedule, reviewing contractor submittals, inspecting construction activities, and delivering post-construction record drawings and data.
![](https://i0.wp.com/www.dibblecm.com/wp-content/uploads/2021/12/20211018_105957_resized_2.jpg?resize=768%2C1024&ssl=1)
![](https://i0.wp.com/www.dibblecm.com/wp-content/uploads/2021/12/20211201_130329_resized.jpg?resize=768%2C1024&ssl=1)
Details
Client
City of Tempe
Location
Tempe, AZ
Services
Construction Management and Inspection
Construction Value
$2.4M