38th Street Relief Sewer

Dibble CM is serving as the Resident Engineer and providing inspection services for this Construction Manager at Risk project that includes installation of approximately 3,500 linear feet of new 8-inch sanitary sewer line along 38th Street and 38th Place from Lincoln Drive to Bethany Home Road. The project is located within the Paradise Valley right-of-way and is a high traffic, residential area.

38th Street Sewer Relief

The 8-inch gravity sewer main will also tie into the existing City of Phoenix wastewater collection system upstream of Lift Station 54 and allow for abandonment. Work includes installing 21 new sewer manholes, approximately 400 linear feet of 6-inch sewer services, and two drainage inlets with approximately 80 linear feet of new RGRCP 18-inch storm drain crossing. Additional scope includes lane modifications to adjust the intersection of 38th Place and Berridge Lane to a “T” intersection, restoration of signing and striping, and landscaping restoration.

Details

Client
City of Phoenix

Location
Phoenix, AZ

Services
Resident Engineer and Construction Inspection

Construction Value
$2.2M

error: This content is protected.